Weihai PE water tank, plastic water tank, plastic storage tank, adding tank water supply pipe installation welding technology reference

Dear, are you familiar with the installation and welding techniques for water supply pipes in Weihai PE water tanks, plastic water tanks, storage tanks, and chemical tanks? If not, you're in the right place. Installing and welding pipes for these types of tanks typically involves five key steps that ensure a secure and long-lasting connection. Let me walk you through them. First, insert the pipe into the clamping frame and adjust the alignment of the two pipe ends. Make sure the pipe is properly positioned and remains stable during the docking process. Second, lock the frame in place and ensure both ends of the pipe are flat. When the material is wrapped around the pipe, it's recommended to use two rings to hold it securely. Keep the pipe ends clean and wipe them with alcohol to remove any dust or debris. Third, place the heating plate under pressure for preheating. Once the pipe ends reach a 2mm gap, release the pressure slightly to allow for proper expansion. Fourth, after the required heating time, quickly remove the heating plate and bring the two pipe ends together under the appropriate pressure. This step is crucial for ensuring a strong and even weld. Fifth, avoid touching the frame or the pipe while the pressure is still being applied during cooling. This helps prevent deformation and ensures a solid bond. When it comes to welding methods, it's important to note that the wall thickness of the pipe plays a significant role. Typically, the thicker section of the pipe serves as the reference point for the welding process. The correct amount of pressure should be applied based on the thickness and material type. Additionally, temperature adjustment for the welding machine is essential. The recommended welding temperature usually matches the temperature used during the production of the pipe. However, it may vary depending on the ambient weather conditions. For example: - When the weather is between 10°C and 20°C, the welding machine temperature should be set between 220°C and 230°C. - When the weather is between 21°C and 30°C, the welding temperature should be adjusted to between 180°C and 210°C. These guidelines help ensure optimal performance and durability of the welded joints. For more information, visit the original source: [http://news.chinawj.com.cn](http://news.chinawj.com.cn) Image credit: [Weihai PE Water Tank, Plastic Water Tank, Plastic Storage Tank, Adding Tank Water Supply Pipe Installation Welding Technology Reference](http://i.bosscdn.com/blog/12/08/33/013832.jpg) Editor: Hardware Business Network Information Center | [http://news.chinawj.com.cn](http://news.chinawj.com.cn)

Steel Screw Machined Parts

Steel Screw Machined Parts,Stainless Steel Screw Machine Parts,Custom Screw Machined Parts,Stainless Steel Screw Machined Parts

Stand Dragon Industrial Co., Ltd. , https://www.standdragontw.com