Failure protection of commissioning boiler operation end

When the boiler is commissioned, when the compressor of the air source used for the test equipment stops operating, the fuel valve will slowly close even though the steam pressure drops, and even if it is switched to manual control, it will not work and the boiler will stop. This is due to the fact that the fuel valve conducts a fail-close operation and the operation of the boiler is safely stopped when the pressure of the air used for the detection device is reduced.

If, when the boiler is stopped, air is still being supplied to the combustion chamber, the residual, leaking fuel gas will not accumulate in the combustion chamber but will be discharged from the chimney, which is called “sweeping”. When an abnormal stop occurs, in order to perform scavenging, when the air pressure of the detection device drops, the air damper for controlling the combustion air is opened, which is a valve failing operation.
Failure protection at the operating end

This PE plastic Septic Tank is specially designed to replace the fibreglass septic tank. It is light in weight but strong in structure. It is made by one time molding without welding and bonding. It can be produced in different colors as per your need. It can also be done with different wall thickness. 

PE Septic Tank

Pe Septic Tank ,Poly Septic Tank,Septic Tank Treatment,Above Ground Septic Tank

Shandong Hiking International Commerce Group Co.,Ltd , https://www.hikingfrp.com